Shower Stall for Duane

ShowerBefore

Shot of the shower stall at the ranch outside Watford City before starting work ...

Closeup of old shower floor.

Closeup of the 30 year old shower floor. Watch your step!

Shower removed and new green treat plate installed.

Shower removed and new green treat plate installed. Behind the fiberglass insulation is the concrete basement wall.

Green treat plywood installed over the studs and insulation at the bottom and moisture and mold resistant sheetrock installed above in the shower stall area.

Green treat plywood installed over the studs and insulation at the bottom and moisture and mold resistant sheetrock installed above in the shower stall area.

Loren and Duane installing the new base and wall units.

Loren and Duane installing the new base and wall units. The new base has steel square tubing supporting the floor. Duane re-packed the original plumbing fixture to stop the leaks and shined up the brass.

Completed shower stall unit with glass sides and doors installed..

Completed shower stall unit with glass sides and doors installed. I fixed the bathroom door so it will close and lock, to reduce risk of moon shock.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.